PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Electrical roughing at Stairs -5 (1st Floor) Facing East (800x600).jpg Electrical roughing at Stairs -5 (2nd Floor) Faicng East (800x600).jpg Installing Stairs -2 (3rd Floor) Facing South (800x600).jpg Metal decking at Roofing Facing North-West (800x600).jpg Continued laying out gravel at the Monumental stairs Facing East (800x600).jpg
Next page Electrical roughing at Stairs -5 (1st Floor) Facing East (800x600)
Electrical roughing at Stairs -5 (1st Floor) Facing East (800x600)